CSM Installation, Morgan Sindall, Sellafield
Project Type:
Installation
Client:
Morgan Sindall, Sellafield
Plant Used:
Artic and Step Frame / 220 Tonne Mobile Crane
CSM delivered to the compound at Whitehaven where we offloaded and placed them on precast bases to allow commissioning works to be completed.
The CSM’s were abnormal loads which required a Sellafield Traffic Management Plan to travel through the Sellafield Site. Once commissioning was complete, the CSM’s were loaded onto our transport and taken to Sellafield where we lifted into their final position.
We provided auxillary facilities and plant at the Whitehaven site. All lifts were completed on a contract lift basis, meaning G&AM Lawson Ltd took full control and responsibility for the job.